For detailed wiring diagrams and advanced setup tables, refer to the Lovato Electric RGAM Manual. Lovato RGAM Automatic Transfer Unit Guide | PDF - Scribd
: The unit monitors the mains power; if an anomaly is detected, it automatically initiates the generator start-up cycle and transfers the load.
This guide provides a comprehensive overview of the setup, wiring, and operational parameters found in the Lovato 31 RGAM 12 user manual. 1. Technical Specifications lovato 31 rgam 12 user manual
Save changed parameters directly to the controller's onboard non-volatile memory to prevent configurations from resetting during total DC power outages. Method B: Remote Software Setup (31 RGAM SW)
Ensure the external E-Stop button is not engaged. For detailed wiring diagrams and advanced setup tables,
The Lovato 31 RGAM 12 belongs to the RGAM series of thermal overload relays. It is designed to be used in conjunction with Lovato’s BF series contactors, specifically the BF09 to BF38 models, but it can also be used as a stand-alone protection device.
For full technical details, you can access the following manuals and guides: Standard Manual Lovato RGAM Controller Manual (Scribd) Software Guide RGAM Remote Control Software Manual Technical Catalog Engine and Generator Controllers Overview or do you need assistance programming a particular parameter The Lovato 31 RGAM 12 belongs to the
Selecting Test Mode mimics a mains blackout without dropping the active live utility feed to the building. The controller starts the engine and stabilizes generator parameters to verify overall system health. Depending on configuration, it runs either as a dry, non-load test or a true emergency load transition exercise. Wiring and Electrical Connections
This public link is valid for 7 days and shares a thread, including any personal information you added. This link or copies made by others cannot be deleted. If you share with third parties, their policies apply. Can’t copy the link right now. Try again later.
The Lovato 31 RGAM 12 acts as the brain of a generator system. Its primary role is to monitor the mains electricity (single or three-phase) and, in the event of a failure, start the generator and transfer the load. Key Features of the 31 RGAM 12: