Galaxy Aqua Premier Installation Manual
Turn on the water supply first. Keep the power turned OFF at the isolation switch. Set the temperature control dial to fully cold. Run the shower for 2 minutes to purge air and fill the internal heating canister.
Is this a or a replacement of an older shower unit?
Minimum running pressure of 1.0 bar (14.5 psi) is required.
Beside him lay the , its pages crisp and smelling of fresh ink. Arthur knew that for a successful "premiere," he had to follow the script exactly. Act I: The Preparation galaxy aqua premier installation manual
Please let me know if you need to verify the of your specific unit, the exact fuse size required, or the wiring layout diagram for your household consumer unit. Share public link
A 30mA RCD must be installed in the circuit.
A 45-amp double-pole switch with a minimum 3mm contact gap is required. Plumbing Specifications Turn on the water supply first
Electrical work must be carried out by a qualified person in accordance with local wiring regulations.
Connect the Wastewater port on the unit to the quick-connect fitting on the drain saddle.
Follow these sequential phases to mount, plumb, and wire the shower unit securely. Phase 1: Positioning and Wall Mounting Run the shower for 2 minutes to purge
Tubing is not cut squarely or not pushed in far enough.
Most likely. Remove the tube, inspect for scratches, re-cut the end cleanly, and re-insert firmly. If still leaking, replace the fitting—they are standard 1/4” push-to-connect types available at any hardware store.
Install an isolating valve in the water supply for future servicing.
or jointing compounds near the unit, as these can degrade the plastic internal components.